Skip to product information
1 of 7

In stock

CRIMSON

Crimson Unstitched 3 Piece Embroidered Lawn Suit CR23L 7A Cobalt Blue - Summer Collection

Crimson Unstitched 3 Piece Embroidered Lawn Suit CR23L 7A Cobalt Blue - Summer Collection

Regular price Rs.15,800.00 PKR
Regular price Rs.16,950.00 PKR Sale price Rs.15,800.00 PKR
Sale Sold out

Crimson Unstitched 3 Piece Embroidered Lawn Summer Collection

  • One Embroidered Front Center Panel With Multicolored Lace Inserts
  • Two Side Panels With Cutwork Lace Inserts
  • 1.6 Meters Embroidered Lace Border For Front And Back Daman
  • 0.6 Meters Embroidered Sleeves
  • 1 Meter Lace Border For Sleeves
  • Two Embroidered Panels For Back
  • 0.3 Meters Solid Dyed Lawn For Back
  • 2 Meters Cutwork Embroidery For Dupatta Lengths
  • 2 Embroidered And Crystal Encrusted Pallu For Dupatta
  • 2.5 Meters Solid Dyed Woven Net For Dupatta
  • 2 Meters Pants With Cutwork Embroidery

Care Instructions

  • Dry Clean Recommended
  • Iron The Clothes At Moderate Temperature 
  • Do Not Use Bleach, Or Stain Removing Chamicals
  • Damp Fabric Should Not Be Exposed To Sunlight 

Shipping

  • Shipping free for bills above 20,000.
  • Delivery in Pakistan: Next 5-6 Working Days after Order Confirmation.
  • Cash On Delivery All Over Pakistan.
  • Shipping World Wide: Next 15-20 Working days after Order Confirmation
  • Outside Pakistan Shipping charges will be calculated as per weight & volume of the package & current standard shipping rates as per destination
View full details
  • Free Shipping

    Shipping free for bills above 20,000.

    Outside Pakistan Shipping charges will be calculated as per weight & volume of the package & current standard shipping rates as per destination,

    inquire on WhatsApp: 03028222466

  • EXPECTED DELIVERY TIME:

    (Pakistan) Unstitched Dispatch Time: Within 1 Week.

    (Pakistan) Stitched Dispatch Time: Within 2 To 3 Weeks.

    (Pakistan) Priority Stitching: Dispatch Time 1 Week.

    (International) Unstitched Dispatch Time: Within 2 Weeks.

    (International) Stitched Dispatch Time: Within 3 To 5 Weeks.

    (International) Priority Stitching: Dispatch Time 2 Weeks.

    Customize Stitching (Local & International): 1 Week Extra.