Elan Unstitched 3 Piece Embroidered Lawn Suit OREL21 EL21-02-A Zel - Summer Collection
Elan Unstitched 3 Piece Embroidered Lawn Suit OREL21 EL21-02-A Zel - Summer Collection
Regular price
Rs.9,500.00 PKR
Regular price
Rs.10,450.00 PKR
Sale price
Rs.9,500.00 PKR
Unit price
/
per
Unstitched 3 Piece Embroidered Lawn Suit From Elan Summer Collection
- Embroidered Front Center Panel (Dobby) 0.44 Meter
- Embroidered Front Left & Right Side Panel (Dobby) 0.44 Meter
- Dyed Back (Dobby) 1.32 Meters
- Embroidered Sleeves (Dobby) 1.32 Meters
- Embroidered Tareez Patti (Pima Lawn) 1.32 Meters
- Embroidered Hem Border (Pima Lawn) 1 Meter
- Embroidered Sleeve Border (Pima Lawn) 1.32 Meters
- Printed Dopatta (Swiss Voile) 2.2 Meters
- Embroidered Dopatta Pallu (Swiss Voile) 2 Meters
- Embroidered Dopatta Side Patti (Swiss Voile) 5 Meters
- Embroidered Dopatta Diagonal Patti (Swiss Voile) 3 Meters
- Dyed Trouser (Cambric) 2.5 Meters
Care Instructions
Care Instructions
- Dry Clean Recommended
- Iron The Clothes At Moderate Temperature
- Do Not Use Bleach, Or Stain Removing Chamicals
- Damp Fabric Should Not Be Exposed To Sunlight
Shipping
Shipping
- Shipping free for bills above 20,000.
- Delivery in Pakistan: Next 5-6 Working Days after Order Confirmation.
- Cash On Delivery All Over Pakistan.
- Shipping World Wide: Next 15-20 Working days after Order Confirmation
- Outside Pakistan Shipping charges will be calculated as per weight & volume of the package & current standard shipping rates as per destination
Share
-
Free Shipping
Shipping free for bills above 20,000.
Outside Pakistan Shipping charges will be calculated as per weight & volume of the package & current standard shipping rates as per destination,
inquire on WhatsApp: 03028222466
-
EXPECTED DELIVERY TIME:
(Pakistan) Unstitched Dispatch Time: Within 1 Week.
(Pakistan) Stitched Dispatch Time: Within 2 To 3 Weeks.
(Pakistan) Priority Stitching: Dispatch Time 1 Week.
(International) Unstitched Dispatch Time: Within 2 Weeks.
(International) Stitched Dispatch Time: Within 3 To 5 Weeks.
(International) Priority Stitching: Dispatch Time 2 Weeks.
Customize Stitching (Local & International): 1 Week Extra.