Hussain Rehar Unstitched 3 Piece Embroidered Lawn Suit HRR24EL AMIRA - Luxury Collection
Hussain Rehar Unstitched 3 Piece Embroidered Lawn Suit HRR24EL AMIRA - Luxury Collection
Hussain Rehar Unstitched 3 Piece Embroidered Lawn Suit - AMIRA - Luxury Lawn Collection
Color: Gradient Marigold Mustard
Fabric Details:
- Shirt: Lawn
- Trouser: Cotton
- Dupatta: Lawn
Fabric Details in Meters:
- Embroidered Dupatta (Lawn) 2.60 Meters
- Embroidered Dupatta Pallu (Lawn) 2.00 Pieces
- Embroidered Front Center Panel (Lawn) 1.00 Piece
- Embroidered Front Right Panel (Lawn) 1.00 Piece
- Embroidered Front Left Panel (Lawn) 1.00 Piece
- Embroidered Back Spray (Lawn) 0.78 Meters
- Embroidered Sleeves Center Panel (Lawn) 2.00 Pieces
- Embroidered Sleeves Right & Left Panel (Lawn) 4.00 Pieces
- Embroidered Sleeves & Back Neck Border (Lawn) 1.30 Meters
- Embroidered Front Back Side Extensions Border (Lawn) 3.00 Meters
- Embroidered Back Daman & Trouser Border (Lawn) 2.25 Meters
- Dyed Trouser (Ivory Cotton) 2.00 Meters
- Printed Finishing For Shirt (Satin Silk) 0.90 Meters
Care Instructions
Care Instructions
- Dry Clean Recommended
- Iron The Clothes At Moderate Temperature
- Do Not Use Bleach, Or Stain Removing Chamicals
- Damp Fabric Should Not Be Exposed To Sunlight
Shipping
Shipping
- Shipping free for bills above 20,000.
- Delivery in Pakistan: Next 5-6 Working Days after Order Confirmation.
- Cash On Delivery All Over Pakistan.
- Shipping World Wide: Next 15-20 Working days after Order Confirmation
- Outside Pakistan Shipping charges will be calculated as per weight & volume of the package & current standard shipping rates as per destination
Share
-
Free Shipping
Shipping free for bills above 20,000.
Outside Pakistan Shipping charges will be calculated as per weight & volume of the package & current standard shipping rates as per destination,
inquire on WhatsApp: 03028222466
-
EXPECTED DELIVERY TIME:
(Pakistan) Unstitched Dispatch Time: Within 1 Week.
(Pakistan) Stitched Dispatch Time: Within 2 To 3 Weeks.
(Pakistan) Priority Stitching: Dispatch Time 1 Week.
(International) Unstitched Dispatch Time: Within 2 Weeks.
(International) Stitched Dispatch Time: Within 3 To 5 Weeks.
(International) Priority Stitching: Dispatch Time 2 Weeks.
Customize Stitching (Local & International): 1 Week Extra.